The Clockwork Building in Hammersmith was voted as the best refurbishment outside of central London. The project included Cor-Ten steel planters manufactured by EverEdge to be installed at the front of the building as well as on the roof.
The planters had to be made to measure to fit into pre-exisiting gaps in the walls.